Mine-Pro platform

Mine inspections and workplace examinations

Keep machine checks and working-place examinations distinct, traceable and searchable.

For safety leads and supervisors

Two different records

An operator's pre-shift inspection documents a particular machine, its meter reading and defects. A designated competent person's working-place examination documents areas and adverse conditions. Mine-Pro keeps these record types separate so leadership can see the origin of each observation.

Follow a condition through closure

Defects and hazards need a location or unit, a reporter, a time and a follow-up. A machine can be held Not Active while a superintendent reviews service return. A workplace condition can be linked to the date of corrective action for later retrieval.

Find the original record

Review by site, day and equipment instead of scrolling through an unbounded feed. Inspectors and staff still need the actual examination or inspection record, not only a summary tile.

In the field

Record the north haul road and active loading bench separately, then tie each observed condition to its correction date.